BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//PYVOBJECT//NONSGML Version 1//EN
BEGIN:VTIMEZONE
TZID:Asia/Bangkok
BEGIN:STANDARD
DTSTART:20000101T000000
RRULE:FREQ=YEARLY;BYMONTH=1
TZNAME:+07
TZOFFSETFROM:+0700
TZOFFSETTO:+0700
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
UID:20260810T183304Z - 20396@bbgsvrod01
DTSTART;TZID=Asia/Bangkok:20260810T170000
DTEND;TZID=Asia/Bangkok:20261231T170000
CREATED:20260810T183304Z
DESCRIPTION:<a href="https://workplace-app.bhirajburi.co.th/event/bhiraj-to
 wer-at-bitec-sustainability-built-into-every-detail-56/register">BHIRAJ TO
 WER at BITEC \n\nSustainability Built into Every Detail</a>\nBHIRAJ TOWER 
 at BITEC Sustainability Built into Every Detail BHIRAJ TOWER at BITEC is m
 anaged with a clear focus on environmental responsibility\, occupant well-
 being\, and operational excellence. Guided by the principles of LEED O+M (
 Leadership in Energy and Environmental Design – Operations & Maintenance
 )\, the building integrates sustainable practices across transportation ac
 cess\, water and energy efficiency\, waste management\, and indoor environ
 mental quality — supporting a workplace that is both efficient and peopl
 e-centered. ​ Location and Transportation Convenient Public Transportati
 on Access BHIRAJ TOWER at BITEC is located close to public transportation\
 , adjacent to BTS Bangna Station\, giving occupants convenient access to t
 he public transport network. HIGHLIGHT Located adjacent to BTS Bangna Stat
 ion Water Efficiency High-Performance Water Fixtures BHIRAJ TOWER at BITEC
  is equipped with high-performance\, low-water-consumption fixtures\, incl
 uding high-efficiency flush and flow fixtures\, helping to reduce the buil
 ding's overall water consumption. Energy Performance Efficient Lighting an
 d Air Conditioning Systems The project features LED lighting together with
  a high-efficiency HVAC (Heating\, Ventilation\, and Air Conditioning) sys
 tem\, enhancing the building's overall energy efficiency. Waste Management
  Waste Segregation and Recycling Partnership The project implements waste 
 segregation by type and has partnered with a third-party waste management 
 company to ensure that recyclable waste is properly processed. Health and 
 Well-Being Facility Maintenance and Renovation Policy A Facilities and Mai
 ntenance Policy has been implemented to ensure that all maintenance and re
 novation activities are properly managed. The policy covers sustainable pr
 ocurement for facility operations and renovation activities\, waste manage
 ment during renovations\, and indoor air quality [...]
DTSTAMP:20260810T183304Z
SUMMARY:BHIRAJ TOWER at BITEC \n\nSustainability Built into Every Detail
END:VEVENT
END:VCALENDAR
